Project Description

OVERVIEW


Garrett Electric completed the replacement of a unit 2 generator turbine. This replacement consisted of pre-disassembly resistance testing, documentation of as-found conditions of electrical apparatuses, existing auxiliary electrical equipment disconnection and removal, and disassembly. The new turbine will improve the rate of fish survival and increase power generation by 3–4%. These advanced technology designs may eventually be applied to other Columbia and Snake River dams.

  • Client: Army Corps of Engineers
  • Location: Burbank, WA

  • Timeline:  May 2016–Current

  • Value: $525,000

  • Specs: TBD

  • Industry Served: Industrial

DOWNLOAD A PDF OF THIS PAGE