Overview
Garrett Electric completed the replacement of a unit 2 generator turbine. This replacement consisted of pre-disassembly resistance testing, documentation of as-found conditions of electrical apparatuses, existing auxiliary electrical equipment disconnection and removal, and disassembly. The new turbine will improve the rate of fish survival and increase power generation by 3–4%. These advanced technology designs may eventually be applied to other Columbia and Snake River dams.
- Client: Army Corps of Engineers
- Location: Burbank, WA
- Specs: TBD
- Timeline: May 2016–Current
CATEGORY:
- Heavy Industrial Electrical Construction
- Hydro Maintenance
INDUSTRY SERVED:
- Industrial